Introduction.

Sian Formwork, established over 12 years, specialises in concreting, formwork, scaffolding, and steel fixing. Partnering with giants like Network Rail and Highways England, they emphasise safety, quality, and sustainability, providing leading structural civil engineering solutions.

The Brief.

business name

Sian Formwork

industry

Construction

claim processing time

Qualifying R&D project 1.

Sian Formwork took on the Chiltern Tunnel South Portal as part of the monumental HS2 project. Their task was to design and implement formwork for the Tunnel's entry point, designed for two Tunnel Boring Machines (TBMs), amplifying their impact on UK civil engineering.

Technical Challenges: Crafting formwork that can bear the heavy weight of concrete and TBMs. Ensuring paramount safety in design and setup. Innovating a gantry system for precise TBM ring placements.

R&D Efforts: Each formwork element underwent rigorous testing for strength and stability. The gantry system was a focal point of R&D, integrating laser guidance, CAD, and detailed analysis.

Technological Advances: Structural Engineering: Utilised advanced analysis techniques to better understand formwork behaviour. Material Science: Transitioned to lightweight, high-strength materials that passed intensive tests. Technology: Leveraged cutting-edge positioning and automated systems for formwork and TBM alignment.

Solutions to Technical Uncertainties: Structural Engineering: Used advanced analysis methods and tested across simulations. Material Science: Tested alternative materials to achieve optimal results. Technology: Introduced refined algorithms for precise machine control.

Conclusion: Sian Formwork's involvement in the Chiltern Tunnel South Portal showcased their drive to innovate. This project not only strengthened their portfolio but also set new standards for the civil engineering sector.

Qualifying R&D project 2.

The Tilhouse Bridge, a key element of the HS2 Central Tunnel project, showcased Sian Formwork's expertise. Tasked with integrating cutting-edge formwork technology and robust steel, their efforts redefined standards in bridge construction.

Technical Challenges: Building a bridge spanning 200 meters in length and 50 meters in height over the River Thames. Using over 2,000 tonnes of high-strength steel without compromising structural stability. Efficiently implementing modular formwork. Ensuring the structure's resilience against environmental challenges like floods.

R&D Efforts: Focused R&D was essential. Every component, from the steel to the modular formwork, was rigorously tested and analysed. They leveraged advanced tools, like finite element analysis, to scrutinise the modular formwork system and the concrete mixture.

Technological Advances: Sian Formwork's breakthroughs included: Structural Engineering: Application of advanced analysis to replicate real-world conditions and study material behaviours. Material Science: Shift to high-quality steel and a novel modular formwork system, enabling design flexibility and accuracy. Technology: Deploying sophisticated alignment systems for precise formwork assembly.

Solutions to Technical Uncertainties: Structural Engineering: Iterative joint design, confirmed through comprehensive analysis and real-world simulations. Material Science: Persistent refinement and testing of the steel and formwork to meet performance goals. Technology: Thorough testing to optimise the concrete mix and procedures in harmony with the new formwork.

Conclusion: The Tilhouse Bridge project underscored Sian Formwork's dedication to innovation. The strides taken in this project fortified their industry standing and provided valuable insights for the civil engineering realm.

Leave us a message.

Qualifying R&D project 3.

The HS2 South Portal tunnel project, running from West Ruislip to London (Nov 2021-Oct 2022), faced challenges given its location near an active railway. The project blended modern tech solutions, strategic planning, a Tunnel Boring Machine (TBM), and innovative foam concrete usage for an overburden slab.

Technical Challenges: Managing risks due to proximity to an active railway. Supporting the TBM operation, inclusive of power and waste management. Designing an overburden slab with foam concrete due to land limitations. Constructing a reinforced concrete "portal" beside the railway. Crafting a gantry system for TBM weight support.

R&D Efforts: R&D was crucial. Geotechnical modelling was used for the foam concrete slab, 3D/BIM for utility diversion, stress analysis for the gantry system, and simulations for risk control.

Technological Advances: Sian Formwork’s innovations spanned: Civil Engineering: A novel foam concrete approach for the TBM launch site. Construction Engineering: Use of 3D/BIM for utility management. Mechanical Engineering: A resilient mobile gantry system designed for TBM dynamics. Risk Management: Simulations for railway safety against potential crane issues. Material Science: Advanced techniques in steel fabrication and joint design.

Solutions to Technical Uncertainties: Geotechnical Engineering: Prototyping and testing optimised the foam concrete slab. Utility Management: 3D modelling streamlined utility placements. Gantry System Design: Comprehensive stress and dynamic load analyses led to a sturdy gantry. Safety Protocols: 3D site models and simulations enhanced risk management. Material Science: Rigorous tests informed improved steel joint designs.

Conclusion: The HS2 South Portal tunnel project exemplified Sian Formwork's dedication to innovation and quality. This venture has not only enriched their portfolio but also elevated best practices in the civil engineering field.